Question 63 of 145
A data center operations team is planning to deploy several NVIDIA HGX H100 8-GPU systems in an existing on-premises facility. Each server draws roughly 10 kW at full load. The facility's current racks are provisioned for 7 kW per rack with traditional room-based air cooling. Before purchasing the systems, what infrastructure consideration should the team address first to ensure a viable deployment?