🔥 3-day streak
CompTIA CySA+ (CS0-003)50 / 147
Question 50 of 147
A CySA+ analyst is helping the security team improve its preparation-phase readiness after a recent malware outbreak required lengthy, manual host rebuilds. During eradication, technicians rebuilt each infected workstation by hand, leading to inconsistent configurations and a recovery window that stretched into days. Which preparation activity would MOST directly reduce recovery time and configuration inconsistency during future incidents?
Reviewed for accuracy · Report an issueNext question