Question 8 of 136
You are deploying a pair of Nexus 9300 leaf switches in a Cisco ACI fabric to provide a vPC to a dual-homed application server. After configuring the vPC interface policy group and applying it to both leaf ports, the server's port-channel remains down and the APIC reports the leaves are not forming a vPC domain. Which configuration step is required to establish the vPC domain between the two leaf switches in ACI?