🔥 3-day streak
Cisco Certified Network Associate (CCNA)35 / 100
Question 35 of 100

You are connecting two multilayer switches, DIST1 and DIST2, with two 10-Gbps links that you want to bundle into a single routed Layer 3 EtherChannel to carry inter-switch routing traffic. On DIST1 you enter the following on the physical interfaces and the port-channel: the interfaces are added to channel-group 1, but the port-channel refuses to form an IP adjacency and 'show etherchannel summary' shows the ports flagged as switchports. Which configuration step ensures the bundle operates as a Layer 3 EtherChannel?

Reviewed for accuracy · Report an issueNext question